By the late 1880s, the city had become too dense with buildings, sewers, and electric cables for the " cut and cover" technique, so a new system had to be devised.
十九世纪八十年代末,伦敦因楼房、污水管、和电缆外露而变得过于拥挤,原因是随挖随填技术,因此,人们需要设计新的设备。
单词 | building sewer |
例句 |
原声例句
每日英语听力 | 双语精读 By the late 1880s, the city had become too dense with buildings, sewers, and electric cables for the " cut and cover" technique, so a new system had to be devised. 十九世纪八十年代末,伦敦因楼房、污水管、和电缆外露而变得过于拥挤,原因是随挖随填技术,因此,人们需要设计新的设备。 |
随便看 |
英语例句辞典收录519880条英汉例句词条,基本涵盖了全部常用单词的造句方法及例句,是英语学习的有利工具。